Is your network PhaseReady?

attend the Phase Ready Seminar from Chronos

Phase Ready?

As you think about the evolution of your network, don't limit your thoughts to the frequency stability you need now. We want to help ensure that network roll-outs today will still be relevant come the explosion of HetNets and Small Cells.

Last few places available for Chronos PhaseReady Scandinavian Events

There are still a few places available for Chronos PhaseReady events taking place next week:

Tuesday 17 November - Sheraton, Stockholm
Thursday 19 November - Radisson Blu Royal, Copenhagen

The  Agenda is available here.

Register now if you are planning, or working towards the rollout of LTE-TDD or LTE-A services, and join our industry experts to discuss both the challenges and solutions available to enable you to deliver microsecond phase to the Network Edge in a manageable and supportable way.

Continue reading
Tags:
1398 Hits
0 Comments

Scandinavian PhaseReady Seminars

Scandinavian PhaseReady Seminars

Supporting phase at the edge of your network is not just a technological challenge. Employing the right technologies in the right places - from the core to the edge of your network – is essential to ensure an available and economically supportable phase delivery network. Chronos' experienced team can ensure that network infrastructure is fit for phase and deliver the tools and services necessary for you to deliver phase wherever and whenever you need it.

Chronos is hosting PhaseReady 2015 events "Supporting your Network Phase" in Stockholm on Tuesday 17 November and Copenhagen on Thursday 19 November 2015.

Join experts from Chronos, Microsemi and Transmode at these free events to assist you with your phase challenges.  Agenda topics include “Delivering Resilient Phase Synchronisation in Transport Networks” and “Phase Synchronisation and Beyond”.

REGISTRATION

Continue reading
1570 Hits
0 Comments

Kings Place - another successful day

Thanks to everyone who attended our Kings Place (@Kingsplaceevent) event yesterday. I think it was a great success and as well as provoking thought about how best to deliver phase to the edge of the network in an operationally supportable way, we also had time to debate the future of engineering!

Use of TDD spectrum also had a good airing; interesting developments in Japan at 3.5GHz could mean phase is essential not only to ensure you use your own spectrum efficiently, but that you don't compromise your competition!

Special thanks to our independent Keynote speakers Zahid Ghadialy (@zahidtg) from TechUK and Hans Sjöstrand from Transmode.

 

Continue reading
1729 Hits
0 Comments

Free PhaseReady Event - London, Wednesday June 3rd

Registration is now open for the latest PhaseReady event at Kings Place London on Wednesday June 3rd. This is the latest in our series of events at this excellent venue, addressing the challenges and solutions available for timing in next generation networks as these networks, services and applications have evolved.

Entitled "Supporting Your Phase Network", we will be discussing the keys areas of preparing for, planning, testing, rolling out and monitoring your timing network to reliably deliver microsecond phase to the edge of your network.

We will be joined for keynote addresses from industry expert Zahid Ghadialy, Transmode's Hans Sjöstrand and Microsemi's Simon Butcher.

Continue reading
1530 Hits
0 Comments

Do you understand how Phase will be delivered to the edge of your Network?

If you're planning, or working towards planning, to rollout out LTE-TDD or LTE-A services, do you know what technologies are available to you and how your network can support these? How do ITU Standards fit in with your network? If you will have Operational responsibility for a Phase Delivery system, how do you ensure you can support it in a timely fashion with the resources you will have available? What Element and Network Testing do you need to do to prepare for this, and how will you interpret any results?

How much of your network is in your direct control? Will you have the ability to be responsible for your own Timing Delivery? Will your voice be loud enough in your own organisation to make this a success? How much resource will you have for planning and preparation? How many PoPs do you have that can support deployments of equipment to support your Edge Timing? How well will your Edge Microwave support Phase Delivery? How will you keep an eye on Timing Delivery performance? How will your Timing Delivery cope with rerouting and Switch, Router and Gateway failure? How will your Timing Delivery cope with Timing Equipment failure?

That's a lot of questions and although we won't have the answers to all of them we do have a clear vision of the range of challenges you face, and the toolkit we have available to enable you to deliver microsecond phase to the Network Edge in a manageable and supportable way.

Come to our free event at Kings Place (http://www.kingsplace.co.uk/) on Wednesday June 3rd; I can't guarantee you will leave with fewer questions than when you arrive, but you will have the answers to most of them at your disposal! Register now for free at http://www.phaseready.com/index.php/8-main-content/11-register-for-phaseready-2015-event.

Continue reading
1797 Hits
0 Comments

Donut or Doughnut - the wrong question?

Back in March I blogged asking whether you (well your phase delivery network actually) were a donut or doughnut person. The donut would be a ring of PRTCs (Primary Reference Time Clocks) at the edge of your network access layer delivering phase to Gateway devices and eNodeBs.The doughnut would have resilient (perhaps Caesium supported) PRTCs in your network core. The terms of this question were really about a battle of technologies as well as network architecture. I've since realised that this question is really not valid for a reliable supportable phase delivery network for TDD and LTE-A services that you are now on the verge of rolling out.

For me most of the technology issues are resolved (microwave links delivering phase being the most challenging), although implementations will vary wildly and standards have yet to catch up with real world network issues.

I think the key requirement for a phase delivery network is not the timing technology that underlines it but what happens when things fail! For example GPS directly connected at the eNodeB or Cell Site Gateway should easily deliver 1.5us at the air interface, but for how long will it continue to meet this requirement if some kind soul cuts through the GPS cable? Will it be long enough for your field force to get to site and effect a repair before the timing requirement is breached at an economic cost?

With this in mind I believe that the ideal phase implementation may well be a donut supported by a doughnut! I also believe this will be best delivered by an phase system independent of the network equipment. With PRTCs at the donut layer supported by PRTCs in the doughnut; especially if supported by Caesium in the core and Automatic Path Asymmetry Compensation (as implemented in the TimeProvider 2700) at the donut layer; next day mobilisation of field force could still allow fixes before the network edge breaks the 1.5us barrier.

Continue reading
2203 Hits
0 Comments

Chronos Technology and Semtech form partnership to deliver managed, PhaseReady™ network edge monitoring & timing solutions

Dramatically reducing the cost of supporting time-alignment in wireless networks including TDD and LTE-A                                                   

Chronos Technology, a global expert in time, timing, phase and monitoring systems, and Semtech Corporation (Nasdaq: SMTC), a leading supplier of analogue and mixed-signal semiconductors, are pleased to announce that they have developed a range of managed solutions which will reduce the transition to time or phase alignment in today’s advanced wireless networks where technologies such as LTE TDD and LTE-A will require more than just simple frequency alignment.

IEEE 1588-2008 Precision Time Protocol (PTP) has become well established as the leading technology for providing frequency, phase and time-of-day synchronisation over packet-based networks. However, deploying PTP-capable equipment in legacy networks can be highly disruptive and a prohibitively expensive upgrade in many cases. The range of managed solutions from the Chronos/Semtech partnership will address this issue enabling accurate delivery of time/phase, protect from GPS vulnerabilities and allow network monitoring. More>>

 

Continue reading
2397 Hits
0 Comments

GPS Timing - coming to the edge of a Network near you?

This may seem a strange title for many readers - if you have a CDMA network you've been working with GPS at cell sites for many years. Here in Europe however we have tended in the past to use the E1 used for backhaul to deliver the sync quality we need to deliver 15ppb at the air interface. We've also more recently delivered this frequency performance from the core of Carrier Ethernet networks using PTP and SyncE.
Should your GPS have a problem, the holdover oscillator (lets say an OCXO) kicks in and gives you time to get out to site and make a fix. Likewise the PTP client devices usually use OCXO for holdover, and although the time to fix is usually shorter than is the case for GPS there is still adequate time to mobilise for a fix.

So why consider GPS at the edge now? Well we're probably a year or so away from having to roll out TD-LTE, or LTE-A features, that require adjacent cells (Macro or Small Cells) to be within +/-1.5us of each other. Packet based timing from the core is still being tested and standardised; microwave radio manufacturers have a real challenge to make this work well (and they're doing great work to get there);and you may not have end to end control of the backhaul network in any case. These issues may or may not be performance affecting enough to put a brake on considering PTP supported by SyncE for phase, but you'd be a fool not to consider the alternatives.

So we examine GPS at the edge; its been done successfully for years, right? Trouble is the game has changed - its got a lot harder. We're all OK with your GPS timing solution locked and running as it should, but what about failure? As in frequency networks the holdover technology kicks in - but OCXO will only hold the +/-1.5us for probably four HOURS, not four DAYS! Have you got the budget, or indeed available power in the cabinet, to use OCXO? TCXO performance continues to improve in leaps and bounds so perhaps using the latest TCXO could give you three hours to mobilise. How is Ops going to handle this? Will you need vehicles parked at strategic motorway junctions waiting for equipment to fail?
On a practical level where can you put the antenna? Have you mast space and the personnel required to roll this out at thousands of locations? Can you hide the antenna in the cabinet? Will it see enough of the sky to work there? Could you roll out Assisted GPS (A-GPS) to help here? If you deploy antennas at low level how long before they're vandalised? Does your network design allow for other cells to provide backup sync? If your timing is embedded in the eNodeB do you have to swap out a whole box to solve a GPS or sync issue?

These issues are real and need addressing, but none of them are necessarily show stoppers to delivering a robust network with adequate phase performance. The trick is to know what the issues are and to address them head on. Don't hope things won't go wrong because they will. Examine the cases of Edge GPS and Phase from the Core from a position that with the right planning and testing they will work.

Make sure you and your network are Phase Ready!
Continue reading
2116 Hits
0 Comments

Achieving phase synchronisation between macro and small cells

Achieving phase synchronisation between macro and small cells

Phase synchronisation between macro and small cells must be achieved if key services are to operate effectively and reliably.  With over 25 years’ experience in industrial GPS systems and network timing solutions, Chronos has now developed three services to help operators assess and prepare their networks for these new challenges.

PhaseReady™ Design and Test: A consultancy service that has already been deployed in a number of equipment manufacturers helping them prepare their products for the market. The service is tailored to meet the objectives of the client and a recent example was a study of the impact of enabling SyncE to support PTP timing transfer.

PhaseReady™ Core: A service that uses advanced tools to assess the suitability of existing GPS / SSU / Grandmaster system locations to supply phase aligned timing signals into the network for distribution.  In-house developed testing methodologies combined with the use of tools including TimePortTM to ensure the phase performance of key GPS sites is properly engineered.

PhaseReady™ Network: A service that works with network planning and operations teams to assess how best to engineer the sync distribution within the network so that the application performance requirements are met. This service identifies the design decisions and parameters in the network that may or are affecting the delivery of good enough phase to the application that requires it.

 

Continue reading
Tags:
2026 Hits
0 Comments

An Independent Sceptic?

Very early in the development of PDH and SDH networks, carriers removed the timing functions from the network elements and implemented independent systems for time and timing dissemination and management. Interesting therefore that as timing requirements for edge applications are probably more stringent and difficult to achieve than ever, a large amount of timing dissemination and management is being taken back in to the network equipment!

What does that mean for you as a carrier? If you're a "bell head" traditional transmission person its a headache; if your a "net head" then perhaps not so much so. Fundamentally though to move microsecond phase coherence to the edge of your network you will need on-path support throughout (although don't jump to the conclusion that if you have on-path support that you will necessarily be successful in meeting all applications requirements).

But how well do these transparent and boundary clocks perform? What about the network in between them, especially if it is not in your control? Will the equipment vendor continue to support and improve their clock implementations for the long term? How do you manage failure scenarios? If you are using a managed service' phase implementation, how do you monitor its performance and hold them to account?

I think we at Chronos, and specialists like us, have a role to play in developing and maintaining your phase networks going forward. We can be that independent sceptic you need; one who understands the issues, can help with phase network design, verification, dimensioning and commissioning.

I will be developing these themes in the coming weeks and months. This is the biggest change in timing networks for at least twenty years and I believe we have the expertise and tools to help you make this process as pain free as possible!

Continue reading
2378 Hits
0 Comments

Is the "Phase Ready" message getting through - Part Two

We're engaged in some excellent work with several Wireless Backhaul manufacturers on PTP for phase and SyncE delivery at the moment. Fundamentally we have a simple message for those planning to roll out networks that require phase at the edge - if the radios have no On Path Support your network WILL NOT deliver microsecond phase coherence at the edge.

Interesting then that it looks like Phase is closer than some of us thought! We're currently assisting with the sync design of a Carrier Ethernet network that will require phase alignment at the edge, and frankly there is still a lot of engineering time and effort needed to find a solution that will deliver network requirements. Here's a good mantra to take with you in to any design exercise - "Don't think that On Path Support at every node ALONE will deliver adequate edge phase performance!"

We're also helping a Carrier with early planning of a Phase Ready network with lots of wireless backhaul that is probably three or four years away. Problem is their radio manufacturer currently does not have any product with On Path Support, but without this they can't engineer a network that will deliver! They're trying to be Phase ready but the market hasn't got there yet.

Continue reading
2192 Hits
0 Comments